3M PBPO NG with external anchoring
/The prices exclude vat/
Symetric Floor Box
Interface between the riser cable and the customer drops cables .
Installation on mid span access cables or on window cut cables .
Design
A pathway for the vertical cable with dual anchoring , on the right and on the left of the coiling area .
A coiling storage area for uncut or pending fibres and micro structures .
A ramp of organiser 4 slots that can be placed on the right or on the left According to the pathway of the riser cable and that can be equipped with
up to 4 cassettes thick of 5 mm , for 12 fusion splices .
Floor Box
The cables anchoring , thanks to plastic cable ties , is realised on the external of the box , in front of the sealing gasket .
As option :
A cover allows to hide and protect the cables entries .
This symetric floor box can be fixed at a distance of 52 mm from the wall , in case of installation on lay out of cables , by using a bracket and a
backmount frame ( this one to protect against dust invasion ) .